Ship 21 Nosecone Prepared for Stacking | SpaceX Boca Chica - Video

66 Views
Ship 21's nosecone was prepared for stacking operations, the structural test stand's cap was installed on the B2.1 test tank, and work on the Booster QD and hood continued.

Video and Pictures from Mary (@BocaChicaGal), Nic (@NicAnsuini), and the NSF Robots. Edited by Jack (@theJackBeyer).

All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF.

Click "Join" for access to early fast turnaround clips, exclusive discord access with the NSF team, etc - to support the channel.

Rolling Updates and Discussion: https://forum.nasaspaceflight.com/index.php?board=72.0

Articles: https://www.nasaspaceflight.com/?s=Starship

NSF Store: https://www.nasaspaceflight.com/shop/

L2 Boca Chica (more clips and photos) from BC's very early days to today.
https://forum.nasaspaceflight.com/index.php?topic=47107.0
(Join L2 and support NSF here: https://www.nasaspaceflight.com/l2/)

0:00 - Sunrise
0:35 - Crane Disconnected from Prefabricated Wide Bay Section
1:10 - Crane Moves to Next Prefab Section
1:21 - Crane Hooked Up to Another Prefabricated Wide Bay Section
1:48 - Ship 21 Nosecone
2:39 - Wide Bay Construction
3:39 - Structural Test Stand Cap Lifted Onto the B2.1 Test Tank
5:11 - Workers Using Grinders on One of SN15's Aft Flaps
5:37 - Crane Disconnected from Structural Test Stand Cap
5:52 - Ship 21 in the Mid Bay
6:33 - Ship 21 Nosecone Outside the High Bay
9:09 - Ship Transport Stand
9:35 - Ship 24 Common Dome Sleeve (middle)
10:03 - Wide Bay Parts Delivered
11:06 - Orbital Launch Site Construction
11:32 - Orbital Launch Tower and Booster 4
11:48 - Orbital Launch Mount Construction
12:15 - Worker At Booster 4 Access Hatch
12:26 - Booster 4 and the QD Arm
13:31 - SpaceX LR 11000 Crane at the Orbital Launch Site
13:31 - Orbital Launch Mount and Production Site
13:51 - Orbital Launch Tower Construction
14:07 - Ship 20 on Suborbital Pad B
14:41 - Booster Quick Disconnect Hood Closed
15:21 - Booster Quick Disconnect Hood Open
15:56 - Mechazilla and Booster 4
16:34 - Orbital Tank Farm Venting
17:19 - LN2 Deliveries to the Orbital Tank Farm
17:33 - Ship 20 and Booster 3's Remains at the Suborbital Launch Site
17:49 - Crane Attach Points Removed From Ship 20
18:06 - Crews Work Underneath Ship 20
18:39 - Orbital Launch Mount Construction
Category
Hot girl stream
Commenting disabled.